La Cenerentola, Winter Opera 2017-2018

Staff Carpenter and Fly crew.

First show as a staff carpenter from construction to strike.

One of many Broadway flats built.

One of many Broadway flats built.

Steel frame for the fireplace, trial assembled and cut by myself, welded by 2nd years.

Steel frame for the fireplace, trial assembled and cut by myself, welded by 2nd years.

First Set, Cinderellas home. (p.c. Alex Jarrus)

First Set, Cinderellas home. (p.c. Alex Jarrus)

Steel Columns for palace. Cut, jigged, then faced with 1/4” Ply and hung with 1/8” AC.

Steel Columns for palace. Cut, jigged, then faced with 1/4” Ply and hung with 1/8” AC.

 
1 of 8 Carriages built for the Grand staircase.

1 of 8 Carriages built for the Grand staircase.

Cinderellas window, Stretched Muslin and 1”x6”.

Cinderellas window, Stretched Muslin and 1”x6”.

Close up of fireplace unit. (p.c. Alex Jarrus)

Close up of fireplace unit. (p.c. Alex Jarrus)

Fabricated palace Set, railings, Grand staircase and columns by myself and the team. Chandeliers CNC’d from Sintra plastic. (p.c. Alex Jarrus)

Fabricated palace Set, railings, Grand staircase and columns by myself and the team. Chandeliers CNC’d from Sintra plastic. (p.c. Alex Jarrus)

Previous
Previous

Concert Work

Next
Next

Next to Normal